C19123 - Cerone Division Boiler & Propane Tank Replacement (IFB)
Important Dates
Overview:
This Invitation For Bid (IFB) has now migrated in ProcureNow. Go to https://secure.procurenow.com/portal/vta for details and requirements.
For purposes of this Contract, the Work consists of furnishing all labor, materials, tools, equipment, services, supervision, and incidentals necessary to replace the propane gas storage and distribution system, and to modify the existing Heating Hot Water (HHW) boiler system at VTA’s Cerone Division bus operations and maintenance facility located at 3990 Zanker Road, San Jose.
Contractor will install a new propane storage and distribution system consisting of a 30,000-gallon Liquified Petroleum Gas (LPG) storage tank, fill station, LPG vaporizers, all associated above and below ground piping, valves, safety equipment, connection to existing propane pipe networks, and testing and commissioning of the propane storage and delivery system. The Work includes related controls and monitoring systems, constructing concrete support structures, and all related civil, electrical, and plumbing work. Upon commissioning of the new propane systems, Contractor will decommission, demolish, and dispose of the existing propane storage tank and system, including related fill port, piping, and vaporizers.
Contractor will modify the existing HHW boiler system, including constructing a new water treatment system for the existing centralized boiler plant in Building F. Contractor will also modify and replace HHW distribution piping from Building F to the adjacent buildings served and restore the HHW system to proper operation. Contractor will also remove unused remnants of an older decommissioned boiler system from Building F. The Engineer’s Estimate for this Work ranges from $1,000,000 to $1,800,000.
Required Licenses: Class A (General Engineering) or Class B (General Building).
Important Notes:
- Prequalification statements may be submitted up until the time of bid opening.
- Bidders will be considered unresponsive, if their pre-qualification statement is ultimately not approved after the review and verification process.
Due to the time required to review and verify pre-qualification statements, the review and verification process may not complete until after the date of bid opening for any prequalification statements received by VTA within three weeks of bid opening.