Bus service is fully restored. Rail service remains paused and will resume once safety checks are complete. We'll update you as soon as service resumes. Thanks for your patience!
Updated information on labor negotiations with the Amalgamated Transit Union Local 265 can be found on our negotiations page.
Cerone Division Boiler & Propane Tank Replacement (Pre-Qualification)
C19123 - Cerone Division Boiler & Propane Tank Replacement (Pre-Qualification)
Invitation for Bid (IFB)
Closed
Due Date:
Solicitation ID:
C19123
NAICS Code:
238220 - Plumbing, Heating, and Air-Conditioning Contractors
238290 - Other Building Equipment Contractors
236220 - Commercial and Institutional Building Construction
238910 - Site Preparation Contractors
238110 - Poured Concrete Foundation and Structure Contractors
238210 - Electrical Contractors and Other Wiring Installation Contractors
237120 - Oil and Gas Pipeline and Related Structures Construction
Santa Clara Valley Transportation Authority is soliciting Pre-Qualification Statements from bidders with construction expertise for the contract described below. It is anticipated that the Invitation For Bid will be advertised in January 2020 with Bid Opening in February 2020.
The Work consists of furnishing all labor, materials, tools, equipment, services, supervision, and incidentals necessary to replace the HHW boiler system and the propane gas storage and distribution system at VTA’s Cerone Division bus operations and maintenance facility located at 3990 Zanker Road, San Jose. The Contract will construct (i) two new propane fired boiler plants, (ii) install new above and below ground HHW piping, (iii) connect to existing HHW systems, and (iv) test and commission the new HHW systems. The Contract will also (i) install a new propane storage and distribution system consisting of a 30,000-gallon Liquified Petroleum Gas (LPG) storage tank, (ii) fill station, (iii) LPG vaporizers, (iv) all associated piping, valves, safety equipment, connection to existing propane pipe networks, and (v) testing and commissioning of the propane storage and delivery system. The Work includes related controls and monitoring systems, constructing bollards and concrete support structures, and all related civil, electrical, and plumbing work. The contract will decommission, demolish, and dispose of the existing propane storage tank and system, including related fill port, piping and vaporizers. The contract will also demolish and dispose of the existing central boiler plant and related HHW facilities and equipment inside Building F.