Bus service is fully restored. Rail service is fully restored on the Orange Line, and partially restored on the Blue Line from Downtown San Jose to Baypointe. The rest of the light rail system will resume service once safety checks are complete. We'll update you as soon as service resumes. Thanks for your patience!
Updated information on labor negotiations with the Amalgamated Transit Union Local 265 can be found on our negotiations page.
Facilities Lighting Maintenance
M19120 - Facilities Lighting Maintenance
Invitation for Bid (IFB)
Awarded
Due Date:
Solicitation ID:
M19120
NAICS Code:
561790 - Other Services to Buildings and Dwellings
5617 - Services to Buildings and Dwellings
Important Dates
Release Date:
Due Date:
Conference Date:
Overview:
Contractor shall provide all labor, materials, tools, lifts, portable lifts, ladders and equipment required for the routine and recurring maintenance, at the locations identified in the Technical Specification, on all incandescent lights, HID lights, fluorescent lights, and fixtures on the inside of the buildings; all lamps and LED fixtures connected to the outside of the buildings; exterior lights illuminating walkways; and facility stairs, and ramps; all parking lot and pole lights, plaza pole lights, sensors, photo cells, illuminated signs; emergency signs; emergency lights, and emergency light battery packs; exit lights, pilaster lights, bollard lights, landscape lights, bridge lights and interior elevator car lifts, tube guards, ballasts and diffusers.
The Engineer’s Estimate for this Work ranges from to $460,000 -$660,000 . Refer to Section 6.4 Time for Performance for the time limit to complete all Work.
The Bidder to whom the Contract will be awarded (“Contractor”) must, at the time of Bid submittal, possess current licenses in the following classifications issued by the California Department of Consumer Affairs, Contractors State License Board:
License: Class A (General Engineering) or C-10 (Electrical)
A combination of prime Contractor and subcontractor license is acceptable only when each subcontractor’s scope of work is identified in Bid Form #3 and each subcontractor is properly licensed at the time of Contract award. Regardless of whether a subcontractor must be identified at the time of Bid, all of Contractor’s subcontractors must also be properly licensed.