334210 – Local area network (LAN) communication equipment
423690 – Communications equipment
Important Dates
Release Date:
Due Date:
Conference Date:
Overview:
This is for the procurement of the Gigabit Core Network to replace/upgrade the obsolete Core Distribution network equipment at River Oaks Center, BayPoint, and Conventions Center. The Gigabit network is an essential and critical system to support Fare handling form the Clipper Reader, allows access to all the platform CCTV capabilities, provides passenger information for the signs (PIMS) on each platform, allows LRV CCTV off loading and additional systems such as Substation Power Monitoring and other VTA Systems. This project is needed to ensure that these systems continue to operate reliably and allow for reasonable future growth as video and data needs continue to increase.
Pre-Bid Conference Date: August 19, 2020, 10:00 AM P.T.
Bid Submission Deadline was changed to: September 29, 2020, 2:00 PM P.T. from September 15, 2020.
Reposted the Intent to Award Letter for IFB P20127 with my signature.
Posted the Notice of Intent to Award Letter which can be found on the attachment section.
Posted Addendum No. 3 to replace the FTA Requirement Clauses to its entirety with the addition of the NDAA S889 Certification to submit with the Seal Bid for IFB P20127.
Posted Addendum No. 2 to push the Bid Due date to September 29, 2020.
Addendums
Name
Date
Download
Replace the FTA Required Clauses to its entirety with the addition of the NDAA S889 Certification