WHAT: Nightwork and lane closures, July 18-22, 2022, between 10:00 pm-5:00 am nightly.
WHERE: Along multiple lanes of De La Cruz Blvd between Seaboard Ave and the US-101 southbound off-ramp.
WHY: The installation of underground irrigation and drainage system.
LANE CLOSURES: Multiple lanes along De La Cruz Blvd between US 101 off-ramp and Seaboard Ave. and the northbound US 101 off-ramp toward De La Cruz Blvd.
NB US 101 AND NB CA-87 OFF-RAMP to TRIMBLE Rd OFF-RAMP CLOSURE DETOUR DESTRIPTIONS:
DETOUR from northbound US 101 toward De La Cruz Blvd/Trimble Rd.
- EXIT SAN TOMAS Expy OFF-RAMP
- ENTER US 101 southbound ON-RAMP
- EXIT DELA CRUZ Blvd OFF-RAMP (END DETOUR)
DE LA CRUZ Blvd/TRIMBLE Rd Northbound CLOSURE DETOUR DESTRIPTIONS:
DETOUR from northbound De La Cruz to northbound US 101
- LEFT ON CENTRAL Expy
- RIGHT ON SCOTT Blvd
- RIGHT ON SAN TOMAS Expy
- ENTER US 101 northbound ON-RAMP (END DETOUR)
DETOUR from Central Expy to northbound US 101
- LEFT ON LAFAYETTE St
- RIGHT ON ALDO Ave
- RIGHT ON DE LA CRUZ Blvd
- RIGHT onto northbound US 101 ON-RAMP (END DETOUR)
DETOUR from CENTRAL Expy to northbound TRIMBLE Rd
- LEFT ON LAFAYETTE St
- RIGHT ON ALDO Ave
- RIGHT ON DE LA CRUZ Blvd
- LEFT ON TRIMBLE Rd (END DETOUR)
DETOUR from northbound DE LA CRUZ Blvd to northbound TRIMBLE Rd
- LEFT ON CENTRAL Expy
- RIGHT ON LAFAYETTE St
- RIGHT ON ALDO Ave
- RIGHT ON DE LA CRUZ Blvd
- LEFT ON TRIMBLE Rd (END DETOUR)
DETOUR from northbound LAFAYETTE St to northbound TRIMBLE Rd
- RIGHT ON ALDO Ave
- RIGHT ON DE LA CRUZ Blvd
- LEFT ON TRIMBLE Rd (END DETOUR)
NOTES: For the safety of the public and construction workers, traffic control measures will be used when needed. Information and warning signs will be posted to ensure safety. Construction crews will make every effort to minimize inconvenience to motorists, bicyclists, pedestrians, businesses, and neighbors.
For more information: visit the project webpage at: www.vta.org/trimbleimprovement, or call VTA’s Community Outreach Department at (408) 321-7575, (TTY) 408-321-2330, or email at community.outreach@vta.org.
The installation of underground irrigation and drainage system along De La Cruz Blvd.
Multiple lanes along De La Cruz Blvd between US 101 off-ramp and Seaboard Ave. and the northbound US 101 off-ramp toward De La Cruz Blvd.