Notice of Geotechnical Work along Diridon 4/12 - 4/26
WHAT
- Contractors will be collecting soil samples and installing groundwater monitoring instruments around the future Diridon Station.
WHERE
- The work will take place along W Santa Clara St...
Contractors will be collecting soil samples and installing groundwater monitoring instruments around the future Downtown San José.
LOCATION: Capitol Expressway between Capitol Ave and Eastridge Loop.
DATES & TlMES:
June 20 to July 29. 2024.
8:00 a.m. to 5:00 p.m.
TRAFFIC CONTROL:
West shoulder closure between...
DATES & TIMES:
LOCATION: Capitol Expressway between Ocala Ave and Story...
Contractors will be conducting soil resistivity testing to determine soil electrical resistance values to support the future BSVII Diridon Station grounding design.
The work will take...
Contractors will be conducting geotechnical explorations around the future Diridon Station
The work will take place in the Diridon Station Parking Lot bounded by W. Santa Clara St, Cahill...
Contractors will be conducting geotechnical explorations around the future Downtown San José Station to help prepare
The work will take place in Downtown VTA’s Parking lot, 55-A W Santa...
Contractors will be preparing the site for directional boring and trench installation
The work will take place on N. Montgomery St. from Julian St. to Cinnabar St.
Weather and conditions permitting, the south and northbound US-101 at De La Cruz/Trimble interchange will be closed overnight, beginning July 18, 2023, for girder/beam work at the US-101/De La Cruz...
Pile driving is underway. Residents and motorists in East San Jose will see pile driving activities during the day, and heavy equipment mobilization at night, as needed. Pile driving will continue for...
Due to the construction of the Eastridge to BART Regional Connector Project, Eastbound lanes on Ocala Avenue, between Capitol Expressway and Leeward Drive, will be closed every day beginning on 10/02...
October 1 - October 18, 2019 between 9:00 AM - 3:00 PM, Monday through Friday
S 8th Street, south of E. Santa Clara Street in San José
Subsurface explorations/borings
...Weather and conditions permitting, acoustic testing activities will occur in portions of the Winchester Station Park & Ride lot.
December 5 – December 9, 2019 between 8:15 AM and 4:15 PM, Monday through Friday
On the western side of Las Plumas Ave north of N. Marburg Way, west of Nipper Ave
Subsur...
December 2 - December 4, 2019
On the western side of Marburg Way, west of N 33rd Street
Subsurface explorations/borings
To assess soil conditions
November 25 - November 27, 2019
On the eastern side of 8th Street, at the southeastern corner of 8th Street and E. Santa Clara Street
Subsurface explorations/borings
...December 2 - December 9, 2019
On the eastern side of White Street, south of The Alameda
Subsurface explorations/borings
To assess soil conditions
December 10 - December 18, 2019
On The Alameda, in front of Whole Foods between White Street and Wilson Avenue
Subsurface explorations/borings
To assess soil...
December 10 - December 12, 2019
On the western side of Almaden Boulevard, south of W. Santa Clara Street
Subsurface explorations/borings
To assess soil...
December 11 - December 20, 2019
On S 22nd Street and S 21st Street, south of E. Williams Court, Woodtown Court, and Woodfalls Court
Subsurface explorations/borings