2016 Measure B Citizens' Oversight Committee
2016 Measure B Citizens' Oversight Committee (MBCOC)
Voters, by approving Measure B in November 2016, entrusted the MBCOC with oversight to ensure that 2016 Measure B funds are being spent...
Voters, by approving Measure B in November 2016, entrusted the MBCOC with oversight to ensure that 2016 Measure B funds are being spent...
The Winchester Station is a 1.6 – acre property located on Winchester Blvd between Budd and Camden Avenues. This property currently serves as a Park & Ride lot for Light Rail and Bus passengers. The...
At the VTA Board of Directors meeting on May 5th, 2022, the VTA Board will be voting to award the first initial stage of the Tunnel & Trackwork Contract Package 2 (CP2) for VTA’s BART Silicon Valley...
Thank you to all our riders who spoke with us, emailed, and called in about the 2023 Transit Service Plan. We received incredible feedback on the draft plan...
*clarification on exemption process with regards to an appeal (question C.9)
1. What is VTA’s vaccination requirement and where can I find more...
Parts of Bird Ave, Montgomery St. and Autumn St. in San Jose have been renamed Barack Obama Blvd. This affects Routes 64A, 64B, 68, 500 and the SCMVC Shuttle.
Route | ...
VTA’s BART Silicon Valley Phase II Extension Project includes an approximately five-mile long tunnel. Tunnel construction is anticipated to begin south of the Santa Clara...
Please visit our Open Data Portal for access to VTA's open data, including transit, active transportation, congestion management and more.
Project locations are in the City of San Jose at the southbound (SB) US-101 diagonal on-ramp from eastbound and westbound Story Road (Location 1) and SB US-101 to SB State Route (SR) 87 freeway to...
The purpose of VTA’s Climate Action and Adaptation Plan (CAAP) is to reduce greenhouse gas emissions (GHG) associated with transportation use and operations and prepare for climate change impacts that...
In January 2022, the Santa Clara Valley Transportation Authority (VTA) through funding from the Metropolitan Transportation Commission (MTC), initiated a Community-Based Transportation Plan (CBTP) in...
VTA has a responsibility to provide a safe and healthy workplace for its employees. Based on societal transmission and infection rates, it is known that unvaccinated individuals are at a greater risk...
Route | Description of Changes |
Blue |
Weekday: Minor schedule adjustments will be made. Saturday: Minor schedule adjustments will be made. Sunday: Minor schedule... |
VTA will hold an informational community meeting to discuss the I-280 Soundwalls Project in early 2024.
The Santa Clara Valley Transportation Authority (VTA), in cooperation with the City...
VTA’s BART Silicon Valley Phase II Project will extend BART service six miles from the Berryessa Transit Center into downtown San Jose and ending in the City of Santa Clara. Early construction...
Your comments regarding the VTA BART Phase II project have been received...
Streets nest into the scaled nature of land use. Local and collector streets are land uses that fill in between buildings and sites. Arterial streets can serve as corridor spaces, which connect...
Create a connected network of streets, sidewalks, and bikeways.
Provide wide sidewalks with unobstructed through zones. The through zone is the part of the sidewalk reserved for pedestrian movement along the street.
Design narrower travelways. Travelway width affects pedestrian crossing distance and vehicle speed, but also the street’s sense of enclosure, visual appearance, and perception as a barrier. Wide...
Minimize conflict points and shorten crossing distances.
Speed up transit. On VTA’s high-frequency network, provide design and operational enhancements that reduce transit vehicle delay.